Prism Tower 3201

Prism Tower 3201 | SSTS Fitout
SSTS Fitout - Prism Tower 3201 Luxury Apartment Renovation

Prism Tower 3201

Premium High-Rise Apartment Renovation & Fitout

Location
Prism Tower
Project Type
Luxury Residential
Duration
55 Days
Status
Completed

Project Overview

Design Concept

Sophisticated contemporary design with panoramic city views, premium finishes, and intelligent space planning. The 32nd-floor apartment features floor-to-ceiling windows, creating a seamless connection between indoor luxury and breathtaking Dubai skyline views.

Materials Used

  • Premium engineered wood flooring
  • Custom Italian kitchen with quartz countertops
  • Smart home automation and lighting system
  • Luxury bathroom fixtures from Grohe
  • Custom-built wardrobes with premium finishes

Key Features

  • Open-plan living with panoramic Burj Khalifa views
  • Custom entertainment wall with integrated sound system
  • Luxury master bathroom with rain shower
  • Walk-in wardrobe with custom organization
  • Spacious balcony with premium outdoor furniture

Scope of Work

Demolition & Prep

  • Complete removal of existing partitions and finishes
  • Structural assessment and modifications
  • MEP (Mechanical, Electrical, Plumbing) disconnection
  • Surface preparation for premium installations

Interior Construction

  • New partition walls and premium false ceilings
  • Custom joinery and luxury built-in furniture
  • Premium flooring installation throughout
  • Feature walls and acoustic treatments

Finishing & Fixtures

  • Installation of designer lighting fixtures
  • Premium plumbing and sanitaryware installation
  • Custom window treatments and motorized blinds
  • Final detailing and comprehensive quality inspection

Project Timeline

Week 1-2

Planning & Demolition

Detailed planning, measurements, and complete demolition of existing structures. Site preparation and procurement of premium materials.

Week 3-5

Structural Work

Construction of partition walls, premium false ceilings, and structural modifications. Electrical and plumbing rough-ins with premium systems.

Week 6-7

Finishing & Installation

Premium flooring installation, painting, custom cabinetry fitting, and luxury fixture installation. Final touches and premium detailing.

Week 8

Final Inspection & Handover

Comprehensive quality checks, final cleaning, client walkthrough, and project handover. Address any final adjustments and system testing.