Office Fit Out & Renovation Services

Prism Tower 1701

Prism Tower 1701 | SSTS Fitout
SSTS Fitout - Prism Tower 1701-02 Luxury Apartment Renovation

Prism Tower 1701-02

Luxury Apartment Renovation & Fitout Project

Location
Business Bay
Project Type
Luxury Residential
Duration
65 Days
Status
Completed

Project Overview

Design Concept

Ultra-luxury contemporary design with premium finishes, panoramic city views, and sophisticated living spaces. The design emphasizes clean lines, premium materials, and seamless integration of indoor and outdoor living areas with floor-to-ceiling windows.

Materials Used

  • Premium Italian marble flooring throughout
  • Custom European kitchen with integrated appliances
  • Smart home automation and lighting control system
  • Luxury bathroom fixtures from premium brands
  • Custom-built wardrobes and storage solutions

Key Features

  • Open-plan living with panoramic Burj Khalifa views
  • Custom entertainment wall with integrated technology
  • Spa-inspired master bathroom with premium fixtures
  • Walk-in wardrobe with custom organization system
  • Private balcony with outdoor seating area

Scope of Work

Demolition & Prep

  • Complete removal of existing partitions and finishes
  • Structural assessment and reinforcement work
  • MEP (Mechanical, Electrical, Plumbing) disconnection
  • Surface preparation for premium installations

Interior Construction

  • New partition walls and premium false ceilings
  • Custom joinery and luxury built-in furniture
  • Premium flooring installation throughout
  • Feature walls and premium wall finishes

Finishing & Fixtures

  • Installation of luxury lighting fixtures and controls
  • Premium plumbing and sanitaryware installation
  • Custom window treatments and premium hardware
  • Final detailing and quality inspection

Project Timeline

Week 1-3

Planning & Demolition

Detailed planning, measurements, and complete demolition of existing structures. Site preparation and procurement of premium materials.

Week 4-6

Structural Work

Construction of partition walls, premium false ceilings, and structural modifications. Electrical and plumbing rough-ins with premium systems.

Week 7-9

Finishing & Installation

Premium flooring installation, painting, custom cabinetry fitting, and luxury fixture installation. Final touches and premium detailing.

Week 10

Final Inspection & Handover

Comprehensive quality checks, final cleaning, client walkthrough, and project handover. Address any final adjustments and system testing.

Leave a Reply

Your email address will not be published. Required fields are marked *