Office Fit Out & Renovation Services

Business Bay Apartment C-303 — Full Renovation by SSTS Fitout (Dubai)

Business Bay Apartment C-303 — Full Renovation by SSTS Fitout (Dubai) | SSTS Fitout
SSTS Fitout - C-303 Business Bay Apartment Renovation

Business Bay Apartment C-303

Complete Renovation & Fitout Project

Location
Business Bay
Project Type
Residential
Duration
45 Days
Status
Completed

Project Overview

Design Concept

Modern minimalist design with clean lines, neutral color palette, and strategic use of natural light. The design focuses on creating a spacious, airy feel while maximizing functionality.

Materials Used

  • Premium Italian marble flooring
  • Custom-made cabinetry with matte finishes
  • Energy-efficient LED lighting system
  • Smart home automation integration
  • Water-resistant bathroom fixtures

Key Features

  • Open-plan living area with seamless flow
  • Custom-built storage solutions
  • Luxury bathroom with premium fixtures
  • Modern kitchen with integrated appliances
  • Balcony with panoramic city views

Scope of Work

Demolition & Prep

  • Complete removal of existing fixtures
  • Structural assessment and reinforcement
  • Electrical and plumbing disconnection
  • Surface preparation and leveling

Interior Construction

  • Partition walls and false ceilings
  • Custom cabinetry and built-in furniture
  • Flooring installation throughout
  • Wall finishes and painting

Finishing & Fixtures

  • Lighting fixture installation
  • Plumbing and sanitaryware fitting
  • Window treatments and hardware
  • Final cleaning and inspection

Project Timeline

Week 1-2

Planning & Demolition

Detailed planning, measurements, and complete demolition of existing structures. Site preparation and material procurement.

Week 3-4

Structural Work

Construction of partition walls, false ceilings, and structural modifications. Electrical and plumbing rough-ins.

Week 5-6

Finishing & Installation

Flooring installation, painting, cabinetry fitting, and fixture installation. Final touches and detailing.

Week 7

Final Inspection & Handover

Quality checks, final cleaning, client walkthrough, and project handover. Address any final adjustments.

Leave a Reply

Your email address will not be published. Required fields are marked *